SCOPE OF WORK INCLUDED STAIRCASE AND RAILINGS FROM THE FIRST TO THIRD FLOOR SCOPE OF WORK INCLUDED STAIRCASE AND RAILINGS FROM THE FIRST TO THIRD FLOOR SCOPE OF WORK INCLUDED STAIRCASE AND RAILINGS FROM THE FIRST TO THIRD FLOOR Slide 1 Slide 1 (current slide) Slide 2 Slide 2 (current slide) Slide 3 Slide 3 (current slide)