SCOPE OF WORK INCLUDED STAIRCASE, RAILINGS, AND MILLWORK FROM THE FIRST TO THE FOURTH FLOOR SCOPE OF WORK INCLUDED STAIRCASE, RAILINGS, AND MILLWORK FROM THE FIRST TO THE FOURTH FLOOR SCOPE OF WORK INCLUDED STAIRCASE, RAILINGS, AND MILLWORK FROM THE FIRST TO THE FOURTH FLOOR Slide 1 Slide 1 (current slide) Slide 2 Slide 2 (current slide) Slide 3 Slide 3 (current slide)